excl. VAT · incl. VAT: €4,044.81
Specifications
605.79 x 243.79 x 259.11 cm
2,300 kg
33 m³
Full specifications
| Dimensions | |
|---|---|
| External length | 605.79 cm |
| External width | 243.79 cm |
| External height | 259.11 cm |
| Internal length | 589.79 cm |
| Internal width | 235.20 cm |
| Internal height | 238.99 cm |
| Width | 233.81 cm |
| Height | 258.50 cm |
| Weights and capacity | |
| Interior floor space | 13.84 m² |
| Volume | 33.00 m³ |
| Net weight | 2300 kg |
| Max gross weight | 30480 kg |
Related containers
Popular modifications
What a 20ft new hard top container is
A hard top is a shipping container built with a removable steel roof instead of a fixed, welded one. Everything else follows the familiar twenty foot pattern: corrugated steel side walls, eight corner castings, a floor carried on steel cross members and a pair of doors at one end. The difference sits overhead. On a 20ft new hard top container the roof panel comes off, so a closed box becomes an open topped box for as long as loading takes, then becomes a closed box again for the journey. That one feature decides which cargo the unit can accept and how it gets in.
The removable steel roof and how it seals
The roof is a formed steel panel that rests on a flange running around the top rails. It is held down by a line of bolts around its whole perimeter and it seals against a gasket compressed as those bolts are drawn up. Because the closure is mechanical rather than welded, three things decide how well it works: the flatness of the flange, the condition of the gasket, and whether the bolts are tightened evenly around the perimeter rather than a few at a time in one corner. Fitted properly, a bolted roof gives a weather envelope that behaves like the roof of a standard box in rain and wind. Left with three bolts missing along one side, it does not.
The panel carries lifting points so it can be taken off with a crane or with slings from a forklift. It is not a two person lift by hand, and the roof weight for the specific unit offered should be confirmed on the quotation before anyone plans the operation. Once removed, the panel needs somewhere to rest that keeps it flat and clear of the lifting path. A roof panel leaned against a fence is easy to distort, and a distorted panel never seals as cleanly again.
Why the recorded door opening is taller than the recorded interior
Two figures on the specification sheet look contradictory at first glance. The internal height is recorded as 238.99 cm while the door opening height is recorded as 258.50 cm, so the doorway appears to be almost twenty centimetres taller than the space behind it. For a hard top that is normal, and the reason is plain: the door header, the horizontal beam across the top of the door frame, swings out or is removed. With the header moved clear the aperture is no longer limited by that beam, so the height measured at the doorway rises above the height measured under a fitted roof. Both numbers are reported here exactly as recorded, and both are useful. Work with the internal height when you are deciding what fits under a closed roof. Work with the door opening height when you are deciding what can pass through the doorway with the header swung clear.
In practice the swing out header is what allows a tall crated item to be driven or rolled straight in on a forklift instead of being lifted over the top rail. It is also why the type stays useful on sites where no crane is available. The header is refitted and secured before the doors close for transport, and its securing arrangement deserves the same attention as the roof bolts.
Loading from above and what it makes possible
Top loading is the reason most buyers look at this type. With the roof off, a crane, a gantry or a telehandler can lower cargo vertically and set it down exactly where it must sit. That matters for items which cannot be tilted, slid or dragged: machine tools on skids, transformers, stone slabs in A frames, tanks, gearboxes, moulds, cable drums and anything on a frame that has to stay level. It matters for dense loads too, because vertical placement lets the heaviest item be set over the strongest part of the floor structure instead of being dragged the length of the container and loading the floor unevenly on the way.
The working sequence is usually the same. The roof comes off and is set aside, cargo is lowered in and positioned, lashing is fitted, the roof goes back on, the bolts are run up evenly around the perimeter and the doors are closed. Anyone planning a top load should plan the reverse operation at the destination at the same time, because a yard that can lift cargo in is not automatically a yard that can lift it out.
Hard top compared with open top
Both types exist to solve the same problem and they solve it differently. An open top uses a fabric tarpaulin stretched over removable roof bows and held down by a lashing rope through eyelets around the top rails. A hard top uses a rigid steel panel bolted onto a gasket.
- Weather: a bolted steel panel on a sound gasket is a harder envelope than fabric. A tarpaulin can pond water, chafe against the bows and tear, and its seal depends on the rope being tensioned correctly every time.
- Security: a steel panel with perimeter bolts resists casual entry far better than fabric, which can be cut.
- Out of gauge cargo: an open top is friendlier to loads that stand proud of the roof line, because bows and tarpaulin can be left off and the load sheeted separately. A hard top expects its panel to go back on.
- Handling: bows and tarpaulin can be managed by people on the ground. The steel roof needs lifting equipment and a plan.
- Service life: a steel panel that is looked after outlasts a tarpaulin that is repeatedly folded, dragged and left in sunlight.
If the unit will be loaded from above a handful of times and then live as dry storage, the hard top is usually the better long term purchase. If the priority is cargo that will never sit under a roof at all, look instead at an open top or a flat rack.
Recorded dimensions and weights
These are the figures recorded for this unit. Confirm them against the quotation for the container actually offered, because build details vary between production batches.
| Measurement | Recorded figure |
|---|---|
| Internal length | 589.79 cm |
| Internal width | 235.20 cm |
| Internal height | 238.99 cm |
| External length | 605.79 cm |
| External width | 243.79 cm |
| External height | 259.11 cm |
| Door opening width | 233.81 cm |
| Door opening height | 258.50 cm |
| Interior floor space | 13.84 m² |
| Volume | 33.00 m³ |
| Maximum gross weight | 30,480 kg |
| Net or tare weight | 2,300 kg |
Payload arithmetic and how to think about weight
The maximum gross weight recorded is 30,480 kg and the tare is recorded as 2,300 kg. Subtracting one from the other leaves 28,180 kg, which is the arithmetic allowance left for cargo. Two cautions belong with that figure. First, road and rail limits in the country of travel are usually the binding constraint long before a box reaches its own gross rating, and the combination of vehicle, axle configuration and permit decides what can really be carried. Second, a dense point load on a small footprint can overload the floor locally even when total weight sits well inside the limit. Spreading concentrated items across bearers or a steel plate is normal practice, and the lashing plan should be settled before the roof goes back on.
Handling, lifting and stacking
Corner castings at all eight corners take the lifting and stacking loads, so this type is handled with the same spreader, chains or side lifter as any other twenty foot box. Two habits are worth keeping. Move the unit with the roof fitted and bolted wherever possible, because the panel contributes to how the top of the structure holds its shape. And treat the floor as a surface with a grain: cross members run across the width, so a load bearing along the length is supported differently from one bearing across it.
Stacking with the roof removed is not a routine operation and should never be improvised in a yard. Units to be stacked should be closed and complete first.
Buying a 20ft new hard top container: what to check
A new build arrives in a known condition, but this type has more moving parts than a plain box, so the inspection list runs longer.
- Roof panel: gasket continuous and undamaged, every bolt hole filled, and the bolts the ones supplied for the job.
- Door header: operate the swing out mechanism through its full travel and confirm the securing arrangement engages on both sides.
- Flange and top rail: sight along them for distortion, the usual cause of a roof that will not seal.
- Lashing points: count them and check their fixings before planning a securing pattern.
- Floor: clean, dry and free of protruding fixings before anything is set down on it.
- Marking and plating: ask what the unit carries and whether it is intended for sea transport, since that governs what a carrier will accept.
Ask for the roof panel weight, the fixing pattern and the recommended tightening sequence in writing. Those three details decide how quickly the unit turns around on a busy site, and a 20ft new hard top container earns its price through the speed of that cycle rather than through anything visible while it stands still.
Frequently Asked Questions
Why is the door opening height greater than the internal height on a 20ft new hard top container?
Because the door header swings out or is removed. The internal height of 238.99 cm is measured under the fitted roof, while the door opening height of 258.50 cm is measured at the doorway once the header is clear of the aperture. Both figures are recorded as such. Use the internal figure for what fits inside and the door figure for what passes through the doorway during loading.
How is the roof removed and refitted?
The panel has lifting points and is lifted off with a crane or with slings from a forklift, then set down flat and clear of the working area. Refitting reverses that: the panel is landed on the perimeter flange, the gasket is checked for its full length, and the bolts are run up evenly around the whole perimeter rather than being tightened in one region first.
Is a hard top or an open top the better choice?
A hard top gives a rigid, bolted steel roof, which is better for weather resistance, security and repeated use. An open top uses bows and a tarpaulin, which is lighter to handle and more tolerant of cargo standing proud of the roof line. Choose the hard top for long term storage after loading, and the open top for genuinely out of gauge loads.
What cargo allowance does this unit have?
The recorded maximum gross weight is 30,480 kg and the recorded tare is 2,300 kg, so the arithmetic difference available for cargo is 28,180 kg. Road and rail weight limits in the country of travel normally bind first. Dense point loads also need spreading across bearers so the floor is not overloaded locally even when the total weight is comfortably within range.
Can the container be stacked or lifted with the roof off?
Lifting and stacking should be done with the roof fitted and bolted down, because the panel contributes to the shape stability of the top of the structure. Moving a unit with the roof removed is a special operation that needs to be assessed rather than improvised, and units going into a yard stack should be closed and complete beforehand.